Blarney Watermains – Blarney Golf Resort

Kendellen Construction delivered a major water services infrastructure scheme for the Health Service Executive at St Finbarr's Hospital, with a contract value of €1.35 million and a programme duration of three months. The project involved the installation of approximately 4 km of new watermain and 4 km of foul rising main to provide a robust and upgraded utility connection to the hospital campus.

The watermain was routed from Tower to the hospital, with the alignment crossing the grounds of Blarney Golf Resort. This required careful coordination with the resort, the HSE and utility stakeholders to maintain continuity of supply throughout the works. A key element of the project was the construction of a 9-metre-deep pump station located just 8 metres from a fully operational hospital building. Kendellen implemented engineered temporary works and excavation support systems to protect the adjacent structure and ensure safe delivery. Operating within a live healthcare environment, the works were carried out under strict infection prevention controls and were completed on programme, with zero disruption to hospital operations.

Project Details

  • Client: Health Service Executive, St. Finbarrs

    Budget: €1,350,000

    Timelines: 3 months

Complex Deep Civils Adjacent to a Live Hospital

The project included the installation of a 9-metre-deep pump station in close proximity to an occupied hospital building. This required a detailed temporary works design, including engineered shoring and excavation support, to protect existing foundations and maintain structural integrity throughout the excavation and construction process.

Infrastructure Delivery with Zero Operational Disruption

Working alongside a live healthcare facility, the team implemented stringent infection prevention measures, including dust suppression, Aspergillus controls and continuous coordination with hospital estates and infection control personnel. The full scheme was delivered safely, cleanly and on programme, with no interruption to essential hospital services.